ITAC Assessment: CO0471
ITAC logo
ITAC Assessment: CO0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product commercial riding mowers and attachments
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 116,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,094 1,013,189
kWh
Electricity Demand $49,107 4,096
kW-mo/yr
Natural Gas $7,765 1,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $4,320 $5,000 - $4,320
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $710 $460 $280
7,327
kWh
$430
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $110 - $160
4,103
kWh
$230
-
kW-mo/yr
- - $(-280.0)
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,810 - - - $2,810
-
lb
- -
05 3.2121: Convert to electrostatic powder coating $73,840 $690,300 - - - $42,480 $31,360
TOTAL RECOMMENDED $81,790 $695,760 $440
11,430
kWh
$4,980
-
kW-mo/yr
$2,810
-
lb
$42,480 $31,080
TOTAL IMPLEMENTED $3,630 $460 $440
11,430
kWh
$660
-
kW-mo/yr
$2,810
-
lb
- $(-280.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs