Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Catfish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 40,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,498 4,681,500
kWh
Electricity Demand $64,328 12,778
kW-mo/yr
Electricity Fees $36,263 -
Natural Gas $9,320 5,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,526 $53,770 $5,904
90,177
kWh
$622
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,266 $13,725 $3,919
59,865
kWh
$347
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $2,400 $1,080 $2,400
30,653
kWh
- - -
04 2.7134: Use photocell controls $218 $177 $218
3,330
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $351 $906 $351
5,360
kWh
- - -
06 2.7442: Keep doors and windows shut when not on use $4,505 $1,000 $4,505
68,816
kWh
- - -
07 2.2437: Recover waste heat from equipment $12,870 $26,550 - - $12,870
-
MMBtu
-
08 2.4323: Use optimum size and capacity equipment $3,306 $7,045 $2,914
44,511
kWh
$392
-
kW-mo/yr
- -
09 3.6192: Use a less expensive method of waste removal $27,920 $8,875 - - - $27,920
-
Tgal
TOTAL RECOMMENDED $62,362 $113,128 $20,211
302,712
kWh
$1,361
-
kW-mo/yr
$12,870
-
MMBtu
$27,920
-
Tgal
TOTAL IMPLEMENTED $5,074 $2,083 $5,074
77,506
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs