Assessment Year | 2010 |
---|---|
Principal Product | Metal Fabrication |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 165 |
Plant Area |
191,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 5,610
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $317,622 | 5,285,782 |
kWh
|
$0.060 |
Electricity Demand | $221,533 | 17,512 |
kW-mo/yr
|
$12.65 |
Natural Gas | $132,809 | 9,143 |
MMBtu
|
$14.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,311 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,025 | $10,875 |
$5,647
93,966
kWh
|
$3,378
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $852 | $470 |
$852
14,184
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $168 | $97 |
$168
2,788
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,369 | $640 |
$4,016
66,828
kWh
|
$2,353
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,183 | $1,500 |
$7,032
117,000
kWh
|
$3,151
-
kW-mo/yr
|
- | |
06 | 2.7231: Use radiant heater for spot heating | $2,198 | $5,028 | - | - |
$2,198
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $3,116 | $850 |
$3,116
51,852
kWh
|
- | - | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $11,400 | $10,000 |
$7,984
132,839
kWh
|
$3,416
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $43,311 | $29,460 |
$28,815
479,457
kWh
|
$12,298
-
kW-mo/yr
|
$2,198
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,208 | $12,375 |
$12,679
210,966
kWh
|
$6,529
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs