ITAC Assessment: UA0046
ITAC logo
ITAC Assessment: UA0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Newspapers
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range less than $500
k
# of Employees 217
Plant Area 121,000
ft2
Annual Production 36,500,000
pieces
Production Hrs. Annual 6,734
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,404 3,969,920
kWh
Natural Gas $48,442 2,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,580 - $7,580
79,730
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,060 $1,500 $2,060
21,670
kWh
03 2.4221: Install compressor air intakes in coolest locations $2,244 $810 $2,244
23,600
kWh
04 2.2437: Recover waste heat from equipment $9,752 $1,750 $9,752
102,579
kWh
05 2.6212: Turn off equipment during breaks, reduce operating time $3,794 $8,625 $3,794
39,905
kWh
06 2.6123: Remove unneeded service lines to eliminate potential leaks $482 $1,000 $482
5,070
kWh
07 2.6123: Remove unneeded service lines to eliminate potential leaks $482 $1,500 $482
5,070
kWh
TOTAL RECOMMENDED $26,394 $15,185 $26,394
277,624
kWh
TOTAL IMPLEMENTED $4,304 $2,310 $4,304
45,270
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs