Assessment Year | 2009 |
---|---|
Principal Product | Rubber Hoses |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
100,000
ft2
|
Annual Production | 6,000
thousand feet
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,745 | 3,310,000 |
kWh
|
$0.056 |
Electricity Demand | $89,820 | 6,260 |
kW-mo/yr
|
$14.35 |
Natural Gas | $691,536 | 60,913 |
MMBtu
|
$11.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $162,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,020 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,022 | - |
$2,803
52,604
kWh
|
$1,219
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,998 | $1,500 |
$4,751
89,162
kWh
|
$3,247
-
kW-mo/yr
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $362 | $1,534 |
$257
4,816
kWh
|
$105
-
kW-mo/yr
|
- | |
04 | 2.7261: Install timers and/or thermostats | $4,828 | $170 |
$1,786
33,521
kWh
|
- |
$3,042
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $68,100 | $11,400 | - | - |
$68,100
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $8,365 | $1,219 | - | - |
$8,365
-
MMBtu
|
|
07 | 2.2135: Repair and eliminate steam leaks | $46,967 | $1,450 | - | - |
$46,967
-
MMBtu
|
|
08 | 2.2425: Use flue gases to heat process or service water | $22,160 | $33,000 | - | - |
$22,160
-
MMBtu
|
|
TOTAL RECOMMENDED | $162,802 | $50,273 |
$9,597
180,103
kWh
|
$4,571
-
kW-mo/yr
|
$148,634
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,020 | $1,500 |
$7,554
141,766
kWh
|
$4,466
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs