ITAC Assessment: UA0036
ITAC logo
ITAC Assessment: UA0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Precision Machined Artilleries
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 211
Plant Area 97,000
ft2
Annual Production 422,828
pieces
Production Hrs. Annual 7,350
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,735 5,587,500
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $10,392 - $10,392
132,952
kWh
02 2.7261: Install timers and/or thermostats $3,429 $1,700 $3,429
43,846
kWh
03 2.7241: Install outside air damper / economizer on hvac unit $15,005 $15,600 $15,005
191,979
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $29,387 $40,768 $29,387
375,988
kWh
05 2.2437: Recover waste heat from equipment $6,452 $10,320 $6,452
82,511
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $912 $1,500 $912
11,673
kWh
07 2.4323: Use optimum size and capacity equipment $6,637 $17,500 $6,637
81,446
kWh
08 2.7134: Use photocell controls $453 $1,337 $453
5,798
kWh
TOTAL RECOMMENDED $72,667 $88,725 $72,667
926,193
kWh
TOTAL IMPLEMENTED $44,120 $43,968 $44,120
564,459
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs