| Assessment Year | 2021 |
|---|---|
| Principal Product | Retaining Clip |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 289 |
| Plant Area |
250,000
ft2
|
| Annual Production | 1,000,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,104 | 2,000,943 |
kWh
|
$0.084 |
| Electricity Demand | $121,861 | 17,859 |
kW-mo/yr
|
$6.82 |
| Electricity Fees | $50,545 | - |
|
- |
| Natural Gas | $630,649 | 104,427 |
MMBtu
|
$6.04 |
| Other Energy | $1 | 16,446 |
MMBtu
|
$0.000 |
| TOTAL YEARLY COSTS | $971,160 | |||
| RECOMMENDED SAVINGS* | $97,102 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $97,102 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,633 | $50,000 |
$16,334
194,457
kWh
|
$5,299
-
kW-mo/yr
|
- | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $11,108 | $45,000 |
$9,996
118,999
kWh
|
$1,112
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,254 | $17,500 |
$3,824
45,524
kWh
|
$430
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,126 | $15,100 |
$2,614
31,122
kWh
|
$512
-
kW-mo/yr
|
- | |
| 05 | 2.2442: Preheat combustion air with waste heat | $56,981 | $300,000 | - | - |
$56,981
-
MMBtu
|
|
| TOTAL RECOMMENDED | $97,102 | $427,600 |
$32,768
390,102
kWh
|
$7,353
-
kW-mo/yr
|
$56,981
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $97,102 | $427,600 |
$32,768
390,102
kWh
|
$7,353
-
kW-mo/yr
|
$56,981
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs