ITAC Assessment: LE0503
ITAC logo
ITAC Assessment: LE0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Retaining Clip
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 289
Plant Area 250,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,104 2,000,943
kWh
Electricity Demand $121,861 17,859
kW-mo/yr
Electricity Fees $50,545 -
Natural Gas $630,649 104,427
MMBtu
Other Energy $1 16,446
MMBtu
TOTAL YEARLY COSTS $971,160
RECOMMENDED SAVINGS* $97,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,633 $50,000 $16,334
194,457
kWh
$5,299
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $11,108 $45,000 $9,996
118,999
kWh
$1,112
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,254 $17,500 $3,824
45,524
kWh
$430
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,126 $15,100 $2,614
31,122
kWh
$512
-
kW-mo/yr
-
05 2.2442: Preheat combustion air with waste heat $56,981 $300,000 - - $56,981
-
MMBtu
TOTAL RECOMMENDED $97,102 $427,600 $32,768
390,102
kWh
$7,353
-
kW-mo/yr
$56,981
-
MMBtu
TOTAL IMPLEMENTED $97,102 $427,600 $32,768
390,102
kWh
$7,353
-
kW-mo/yr
$56,981
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs