| Assessment Year | 2009 |
|---|---|
| Principal Product | Medium and High Voltage Cable |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified |
| Sales Range | less than $500 k |
| # of Employees | 215 |
| Plant Area |
339,000
ft2
|
| Annual Production | 55,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,451,368 | 23,697,890 |
kWh
|
$0.061 |
| Natural Gas | $75,219 | 4,945 |
MMBtu
|
$15.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $149,449 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $142,368 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $16,663 | - |
$16,663
266,865
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,535 | $3,000 |
$14,535
232,784
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $88,243 | $220,339 |
$88,243
1,413,240
kWh
|
- | |
| 04 | 2.7122: Disconnect ballasts | $2,487 | $162 |
$2,487
39,836
kWh
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $4,594 | $680 |
$4,594
73,581
kWh
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $19,240 | $2,900 | - |
$19,240
-
MMBtu
|
|
| 07 | 2.2212: Use minimum safe oven ventilation | $3,687 | $4,300 | - |
$3,687
-
MMBtu
|
|
| TOTAL RECOMMENDED | $149,449 | $231,381 |
$126,522
2,026,306
kWh
|
$22,927
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $142,368 | $230,539 |
$119,441
1,912,889
kWh
|
$22,927
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs