ITAC Assessment: UA0005
ITAC logo
ITAC Assessment: UA0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product cooked chicken
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 539
Plant Area 87,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 6,370
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,205,553 20,355,476
kWh
Electricity Demand $220,688 47,478
kW-mo/yr
Natural Gas $1,662,784 155,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2136: Install / repair insulation on steam lines $2,346 $620 - - $2,346
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $46,152 $24,000 - - $46,152
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $474 $112 - - $474
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $5,783 $465 - - $5,783
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $13,620 $7,000 - - $13,620
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,737 $1,400 $9,737
228,141
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,336 - $2,336
54,737
kWh
- - -
08 2.7261: Install timers and/or thermostats $426 $590 $426
9,953
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,381 $27,533 $5,144
119,656
kWh
$1,237
-
kW-mo/yr
- -
10 3.5217: Reuse / recycle/ sell paper products $30,550 $6,500 - - - $30,550
-
lb
11 2.2437: Recover waste heat from equipment $21,389 $10,000 - - $21,389
-
MMBtu
-
12 2.2696: Use excess cold process fluid for industrial cooling needs $34,728 $1,615 $9,914
231,833
kWh
$157
-
kW-mo/yr
$24,657
-
MMBtu
-
TOTAL RECOMMENDED $173,922 $79,835 $27,557
644,320
kWh
$1,394
-
kW-mo/yr
$114,421
-
MMBtu
$30,550
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs