Assessment Year | 2007 |
---|---|
Principal Product | cooked chicken |
NAICS | 311615: Poultry Processing |
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 539 |
Plant Area |
87,000
ft2
|
Annual Production | 75,000,000
lb
|
Production Hrs. Annual | 6,370
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,205,553 | 20,355,476 |
kWh
|
$0.059 |
Electricity Demand | $220,688 | 47,478 |
kW-mo/yr
|
$4.65 |
Natural Gas | $1,662,784 | 155,711 |
MMBtu
|
$10.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $173,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $2,346 | $620 | - | - |
$2,346
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $46,152 | $24,000 | - | - |
$46,152
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $474 | $112 | - | - |
$474
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $5,783 | $465 | - | - |
$5,783
-
MMBtu
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $13,620 | $7,000 | - | - |
$13,620
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,737 | $1,400 |
$9,737
228,141
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,336 | - |
$2,336
54,737
kWh
|
- | - | - | |
08 | 2.7261: Install timers and/or thermostats | $426 | $590 |
$426
9,953
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,381 | $27,533 |
$5,144
119,656
kWh
|
$1,237
-
kW-mo/yr
|
- | - | |
10 | 3.5217: Reuse / recycle/ sell paper products | $30,550 | $6,500 | - | - | - |
$30,550
-
lb
|
|
11 | 2.2437: Recover waste heat from equipment | $21,389 | $10,000 | - | - |
$21,389
-
MMBtu
|
- | |
12 | 2.2696: Use excess cold process fluid for industrial cooling needs | $34,728 | $1,615 |
$9,914
231,833
kWh
|
$157
-
kW-mo/yr
|
$24,657
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $173,922 | $79,835 |
$27,557
644,320
kWh
|
$1,394
-
kW-mo/yr
|
$114,421
-
MMBtu
|
$30,550
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs