ITAC Assessment: GT0603
ITAC logo
ITAC Assessment: GT0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carbon and SS Flat Bar
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 25,500
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,189 529,894
kWh
Electricity Demand $18,917 825
kW-mo/yr
Electricity Fees $5,201 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $8,880 - - - - - $8,880
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,300 $1,200 - $1,300
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,071 $3,036 $424
12,896
kWh
$531
-
kW-mo/yr
$116 - -
04 2.7134: Use photocell controls $490 $160 $140
4,396
kWh
$350
-
kW-mo/yr
- - -
05 2.5111: Convert from indirect to direct fired systems $2,200 $3,500 - - - $200
-
gal
$2,000
TOTAL RECOMMENDED $13,941 $7,896 $564
17,292
kWh
$2,181
-
kW-mo/yr
$116 $200
-
gal
$10,880
TOTAL IMPLEMENTED $13,941 $7,896 $564
17,292
kWh
$2,181
-
kW-mo/yr
$116 $200
-
gal
$10,880
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs