ITAC Assessment: UA0004
ITAC logo
ITAC Assessment: UA0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Gray and Ductile Iron Castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 198
Plant Area 150,000
ft2
Annual Production 19,600
ton
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,912,402 35,357,652
kWh
Electricity Fees $12,000 -
Natural Gas $441,893 50,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,724 $34,990 $17,724
325,644
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,674 $974 $5,674
71,687
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $1,587 - $1,587
23,115
kWh
-
04 2.7261: Install timers and/or thermostats $435 $1,534 $435
8,002
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,488 $1,400 $7,488
137,582
kWh
-
06 2.6214: Shut off pilots in standby equipment $2,169 $230 - $2,169
-
MMBtu
07 2.7211: Clean and maintain refrigerant condensers and towers $5,479 $400 $5,479
100,710
kWh
-
08 2.4321: Upgrade obsolete equipment $47,141 $67,908 - $47,141
-
MMBtu
09 2.2515: Use optimum thickness insulation $17,420 $1,926 $17,420
320,213
kWh
-
10 2.4133: Use most efficient type of electric motors $1,180 $2,897 $1,180
21,680
kWh
-
11 2.4231: Reduce the pressure of compressed air to the minimum required $3,282 - $3,282
60,304
kWh
-
TOTAL RECOMMENDED $109,579 $112,259 $60,269
1,068,937
kWh
$49,310
-
MMBtu
TOTAL IMPLEMENTED $3,756 $230 $1,587
23,115
kWh
$2,169
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs