| Assessment Year | 2026 |
|---|---|
| Principal Product | Above Ground Swimming Pools |
| NAICS | 339920: Sporting and Athletic Goods Manufacturing |
| SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 146 |
| Plant Area |
600,000
ft2
|
| Annual Production | 40,000
units
|
| Production Hrs. Annual | 1,920
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $279,822 | 4,044,468 |
kWh
|
$0.069 | |
| Electricity Demand | $254,037 | 15,663 |
kW-mo/yr
|
$16.22 | |
| Natural Gas | $108,491 | 16,006 |
MMBtu
|
$6.78 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,953 | 486 |
Tgal
|
$14.31 | |
| Water Disposal | $2,955 | 486 |
Tgal
|
$6.08 | |
| TOTAL YEARLY COSTS | $652,258 | ||||
| RECOMMENDED SAVINGS* | $480,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.2176: Increase use of automation | $344,402 | $450,000 | - | - | - | - | $344,402 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,071 | $3,500 |
$30,430
439,740
kWh
|
$9,641
-
kW-mo/yr
|
- | - | - | |
| 03 | 4.651: Install back-up equipment | $28,452 | $120,000 | - | - | - | - | $28,452 | |
| 04 | 2.3141: Use battery storage for demand control | $18,185 | $189,000 |
$(-1,277.0)
(-18,460)
kWh
|
$19,462
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,597 | $1,500 | - |
$14,597
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $10,275 | $40,000 |
$1,329
19,200
kWh
|
$1,946
-
kW-mo/yr
|
- | $7,000 | - | |
| 07 | 2.2622: Replace existing chiller with high efficiency model | $9,109 | $45,000 |
$8,891
128,482
kWh
|
- |
$180
-
Tgal
|
$38 | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,953 | - |
$8,953
129,379
kWh
|
- | - | - | - | |
| 09 | 2.4157: Establish a predictive maintenance program | $6,560 | $13,640 | - | - | - | - | $6,560 | |
| TOTAL RECOMMENDED | $480,604 | $862,640 |
$48,326
698,341
kWh
|
$45,646
-
kW-mo/yr
|
$180
-
Tgal
|
$7,038 | $379,414 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs