ITAC Assessment: TT0359
ITAC logo
ITAC Assessment: TT0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Above Ground Swimming Pools
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 600,000
ft2
Annual Production 40,000
units
Production Hrs. Annual 1,920
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,822 4,044,468
kWh
Electricity Demand $254,037 15,663
kW-mo/yr
Natural Gas $108,491 16,006
MMBtu
Waste Disposal Costs
Water Usage $6,953 486
Tgal
Water Disposal $2,955 486
Tgal
TOTAL YEARLY COSTS $652,258
RECOMMENDED SAVINGS* $480,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.2176: Increase use of automation $344,402 $450,000 - - - - $344,402
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,071 $3,500 $30,430
439,740
kWh
$9,641
-
kW-mo/yr
- - -
03 4.651: Install back-up equipment $28,452 $120,000 - - - - $28,452
04 2.3141: Use battery storage for demand control $18,185 $189,000 $(-1,277.0)
(-18,460)
kWh
$19,462
-
kW-mo/yr
- - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,597 $1,500 - $14,597
-
kW-mo/yr
- - -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $10,275 $40,000 $1,329
19,200
kWh
$1,946
-
kW-mo/yr
- $7,000 -
07 2.2622: Replace existing chiller with high efficiency model $9,109 $45,000 $8,891
128,482
kWh
- $180
-
Tgal
$38 -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,953 - $8,953
129,379
kWh
- - - -
09 2.4157: Establish a predictive maintenance program $6,560 $13,640 - - - - $6,560
TOTAL RECOMMENDED $480,604 $862,640 $48,326
698,341
kWh
$45,646
-
kW-mo/yr
$180
-
Tgal
$7,038 $379,414
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs