| Assessment Year | 2026 |
|---|---|
| Principal Product | Fiberglass Resin Panels |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 42 |
| Plant Area |
133,000
ft2
|
| Annual Production | 17,000,000
units
|
| Production Hrs. Annual | 2,400
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $221,799 | 4,322,200 |
kWh
|
$0.051 | |
| Electricity Demand | $55,954 | 12,574 |
kW-mo/yr
|
$4.45 | |
| Natural Gas | $134,044 | 20,673 |
MMBtu
|
$6.48 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,754 | 1,429 |
Tgal
|
$2.63 | |
| Water Disposal | $4,458 | 1,429 |
Tgal
|
$3.12 | |
| TOTAL YEARLY COSTS | $420,009 | ||||
| RECOMMENDED SAVINGS* | $38,080 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,772 | $1,500 |
$13,330
259,845
kWh
|
$1,442
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,898 | $6,000 |
$13,898
270,915
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $5,054 | $3,750 |
$5,054
98,514
kWh
|
- | - | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $3,054 | $8,000 | - | - |
$3,054
-
MMBtu
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $779 | $4,450 |
$543
10,580
kWh
|
$236
-
kW-mo/yr
|
- | |
| 06 | 2.7442: Keep doors and windows shut when not on use | $523 | - |
$523
10,200
kWh
|
- | - | |
| TOTAL RECOMMENDED | $38,080 | $23,700 |
$33,348
650,054
kWh
|
$1,678
-
kW-mo/yr
|
$3,054
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs