| Assessment Year | 2026 |
|---|---|
| Principal Product | Power Transformers |
| NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
378,000
ft2
|
| Annual Production | 90
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $884,912 | 17,548,976 |
kWh
|
$0.050 | |
| Electricity Demand | $959,359 | 58,212 |
kW-mo/yr
|
$16.48 | |
| Natural Gas | $184,992 | 33,354 |
MMBtu
|
$5.55 | |
| Waste Disposal Costs | |||||
| Water Usage | $20,404 | 9,235 |
Tgal
|
$2.21 | |
| Water Disposal | $30,653 | 9,235 |
Tgal
|
$3.32 | |
| TOTAL YEARLY COSTS | $2,080,320 | ||||
| RECOMMENDED SAVINGS* | $194,943 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $112,051 | $500,000 |
$88,447
1,754,897
kWh
|
- |
$18,496
-
MMBtu
|
$2,041
-
Tgal
|
$3,067
-
Tgal
|
|
| 02 | 3.4155: Meter waste water | $20,750 | $5,000 | - | - | - | - |
$20,750
-
Tgal
|
|
| 03 | 2.4226: Use / purchase optimum sized compressor | $18,291 | $80,000 |
$9,690
192,263
kWh
|
$8,601
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,816 | $30,000 |
$13,816
274,127
kWh
|
- | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,880 | $1,500 |
$9,880
196,032
kWh
|
- | - | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,947 | $5,000 |
$5,947
118,000
kWh
|
- | - | - | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,611 | $22,500 |
$4,611
91,488
kWh
|
- | - | - | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,817 | $31 |
$2,021
40,107
kWh
|
$1,796
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.2441: Preheat boiler makeup water with waste process heat | $3,453 | $11,000 | - | - |
$3,453
-
MMBtu
|
- | - | |
| 10 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,327 | $10,000 |
$2,327
46,171
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $194,943 | $665,031 |
$136,739
2,713,085
kWh
|
$10,397
-
kW-mo/yr
|
$21,949
-
MMBtu
|
$2,041
-
Tgal
|
$23,817
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs