ITAC Assessment: TT0357
ITAC logo
ITAC Assessment: TT0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Power Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 378,000
ft2
Annual Production 90
units
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $884,912 17,548,976
kWh
Electricity Demand $959,359 58,212
kW-mo/yr
Natural Gas $184,992 33,354
MMBtu
Waste Disposal Costs
Water Usage $20,404 9,235
Tgal
Water Disposal $30,653 9,235
Tgal
TOTAL YEARLY COSTS $2,080,320
RECOMMENDED SAVINGS* $194,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $112,051 $500,000 $88,447
1,754,897
kWh
- $18,496
-
MMBtu
$2,041
-
Tgal
$3,067
-
Tgal
02 3.4155: Meter waste water $20,750 $5,000 - - - - $20,750
-
Tgal
03 2.4226: Use / purchase optimum sized compressor $18,291 $80,000 $9,690
192,263
kWh
$8,601
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,816 $30,000 $13,816
274,127
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,880 $1,500 $9,880
196,032
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,947 $5,000 $5,947
118,000
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,611 $22,500 $4,611
91,488
kWh
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,817 $31 $2,021
40,107
kWh
$1,796
-
kW-mo/yr
- - -
09 2.2441: Preheat boiler makeup water with waste process heat $3,453 $11,000 - - $3,453
-
MMBtu
- -
10 2.7211: Clean and maintain refrigerant condensers and towers $2,327 $10,000 $2,327
46,171
kWh
- - - -
TOTAL RECOMMENDED $194,943 $665,031 $136,739
2,713,085
kWh
$10,397
-
kW-mo/yr
$21,949
-
MMBtu
$2,041
-
Tgal
$23,817
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs