ITAC Assessment: MA0193
ITAC logo
ITAC Assessment: MA0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product THERMISTORS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,268 3,272,861
kWh
Natural Gas $23,794 3,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,891

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $984 $426 $984
15,533
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,252 $12,000 $22,086
348,769
kWh
$(-8,834.0)
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $40,469 $5,400 $29,232
461,606
kWh
$11,237
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $173 $348 $207
13,189
kWh
$(-34.0)
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,037 $2,609 $2,543
40,152
kWh
$10,494
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $5,438 - $5,438
85,873
kWh
-
TOTAL RECOMMENDED $73,353 $20,783 $60,490
965,122
kWh
$12,863
-
MMBtu
TOTAL IMPLEMENTED $46,891 $5,826 $35,654
563,012
kWh
$11,237
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs