ITAC Assessment: UMS007
ITAC logo
ITAC Assessment: UMS007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Ethanol
NAICS 325193: Ethyl Alcohol Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,200,000 48,941,760
kWh
Natural Gas $8,000,000 1,703,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,352,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $480,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $1,630,000 - $1,630,000
-
MMBtu
02 2.2437: Recover waste heat from equipment $480,000 $800,000 $480,000
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $157,000 $200,000 $157,000
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $85,000 $100,000 $85,000
-
MMBtu
TOTAL RECOMMENDED $2,352,000 $1,100,000 $2,352,000
-
MMBtu
TOTAL IMPLEMENTED $480,000 $800,000 $480,000
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs