ITAC Assessment: TT0344
ITAC logo
ITAC Assessment: TT0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Modified wood
NAICS 454390: Other Direct Selling Establishments
SIC 5963: Direct Selling Establishments
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 40,000
units
Production Hrs. Annual 8,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,138 5,378,880
kWh
Electricity Demand $102,705 16,574
kW-mo/yr
Electricity Fees $271,930 -
Waste Disposal Costs
Water Usage $46,813 11,440
Tgal
Water Disposal $140,960 11,418
Tgal
TOTAL YEARLY COSTS $911,546
RECOMMENDED SAVINGS* $107,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,955 - $19,955
307,000
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,630 - $6,630
102,000
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,246 - $5,246
80,713
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $37,203 $70 - $37,203 -
05 2.6218: Turn off equipment when not in use $3,186 $400 $3,186
49,012
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,895 $5,000 $6,895
106,077
kWh
- -
07 2.7135: Install occupancy sensors $598 $750 $598
9,198
kWh
- -
08 2.4226: Use / purchase optimum sized compressor $27,648 $30,000 - - $27,648
TOTAL RECOMMENDED $107,361 $36,220 $42,510
654,000
kWh
$37,203 $27,648
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs