ITAC Assessment: WI0442
ITAC logo
ITAC Assessment: WI0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum Beverage Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 1,800,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $901,448 22,914,965
kWh
Electricity Demand $34,723 36,684
kW-mo/yr
Electricity Fees $55,542 -
Natural Gas $380,922 80,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $215,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $188,665 $146,300 $352,968
9,240,000
kWh
$113,520
-
kW-mo/yr
$(-277,823.0)
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,332 $6,498 $12,926
338,386
kWh
$3,406
-
kW-mo/yr
-
03 2.3137: Use power during off-peak periods $5,132 - - $5,132
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $2,640 $10,000 - - $2,640
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,559 $500 - - $2,559
-
MMBtu
TOTAL RECOMMENDED $215,328 $163,298 $365,894
9,578,386
kWh
$122,058
-
kW-mo/yr
$(-272,624.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs