Assessment Year | 2023 |
---|---|
Principal Product | Interior Trim |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 353 |
Plant Area |
230,000
ft2
|
Annual Production | 201,600
pieces
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $616,041 | 13,941,792 |
kWh
|
$0.044 | |
Electricity Demand | $389,531 | 27,971 |
kW-mo/yr
|
$13.93 | |
Natural Gas | $101,866 | 9,684 |
MMBtu
|
$10.52 | |
Waste Disposal Costs | |||||
Water Usage | $23,835 | 5,577,800 |
Tgal
|
$0.004 | |
Water Disposal | $67,824 | 5,577,800 |
Tgal
|
$0.012 | |
TOTAL YEARLY COSTS | $1,199,097 | ||||
RECOMMENDED SAVINGS* | $200,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $72,563 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7229: Air condition only space necessary | $74,585 | $185,000 |
$19,292
436,479
kWh
|
- | - |
$55,293
-
MMBtu
|
- | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $51,075 | $120 | - | - | - | - | - | $51,075 | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $38,784 | $10,000 | - | - | - | - | $38,784 | - | |
04 | 2.3212: Optimize plant power factor | $12,488 | $40,000 | - | - | $12,488 | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,867 | $5 |
$4,009
90,698
kWh
|
$4,858
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $6,857 | $372 |
$6,857
155,145
kWh
|
- | - | - | - | - | |
07 | 2.4224: Upgrade controls on compressors | $5,133 | $300 |
$5,133
116,122
kWh
|
- | - | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,000 | $3,000 |
$2,000
45,254
kWh
|
- | - | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $544 | $405 |
$544
12,306
kWh
|
- | - | - | - | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $87 | $50 |
$59
1,343
kWh
|
$28
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $200,420 | $239,252 |
$37,894
857,347
kWh
|
$4,886
-
kW-mo/yr
|
$12,488 |
$55,293
-
MMBtu
|
$38,784 | $51,075 | ||
TOTAL IMPLEMENTED | $72,563 | $1,252 |
$16,602
375,614
kWh
|
$4,886
-
kW-mo/yr
|
- | - | - | $51,075 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs