Assessment Year | 2001 |
---|---|
Principal Product | Artist-qualitiy paint |
NAICS |
n/a
|
SIC | 2850: |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
42,600
ft2
|
Annual Production | 819,353
units
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,127 | 436,920 |
kWh
|
$0.085 |
Electricity Demand | $19,784 | 1,686 |
kW-mo/yr
|
$11.73 |
Fuel Oil #2 | $21,013 | 2,409 |
MMBtu
|
$8.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,244 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $200 | - |
$200
2,617
kWh
|
- | |
02 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $18,236 | $114,000 |
$18,236
158,382
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $7,323 | $979 | - |
$7,323
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $5,330 | $16,000 |
$5,330
43,705
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $418 | $100 |
$418
5,217
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $329 | - |
$329
4,109
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $503 | - |
$503
6,301
kWh
|
- | |
TOTAL RECOMMENDED | $32,339 | $131,079 |
$25,016
220,331
kWh
|
$7,323
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,244 | $1,079 |
$921
11,518
kWh
|
$7,323
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs