ITAC Assessment: SU0116
ITAC logo
ITAC Assessment: SU0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Artist-qualitiy paint
NAICS
n/a
SIC 2850:
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 42,600
ft2
Annual Production 819,353
units
Production Hrs. Annual 2,730
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,127 436,920
kWh
Electricity Demand $19,784 1,686
kW-mo/yr
Fuel Oil #2 $21,013 2,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $200 - $200
2,617
kWh
-
02 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $18,236 $114,000 $18,236
158,382
kWh
-
03 2.2511: Insulate bare equipment $7,323 $979 - $7,323
-
MMBtu
04 2.3212: Optimize plant power factor $5,330 $16,000 $5,330
43,705
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $418 $100 $418
5,217
kWh
-
06 2.6218: Turn off equipment when not in use $329 - $329
4,109
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $503 - $503
6,301
kWh
-
TOTAL RECOMMENDED $32,339 $131,079 $25,016
220,331
kWh
$7,323
-
MMBtu
TOTAL IMPLEMENTED $8,244 $1,079 $921
11,518
kWh
$7,323
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs