| Assessment Year | 2022 |
|---|---|
| Principal Product | Wood Perservatives |
| NAICS | 325320: Pesticide and Other Agricultural Chemical Manufacturing |
| SIC | 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
580,000
ft2
|
| Annual Production | 156,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $299,278 | 4,395,600 |
kWh
|
$0.068 | |
| Electricity Demand | $132,611 | 9,615 |
kW-mo/yr
|
$13.79 | |
| Natural Gas | $108,115 | 18,866 |
MMBtu
|
$5.73 | |
| LPG | $16,650 | 453 |
MMBtu
|
$36.75 | |
| Waste Disposal Costs | |||||
| Water Usage | $34,633 | 11,186 |
Tgal
|
$3.10 | |
| Water Disposal | $37,164 | 11,186 |
Tgal
|
$3.32 | |
| TOTAL YEARLY COSTS | $628,451 | ||||
| RECOMMENDED SAVINGS* | $118,544 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $76,327 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $33,933 | $15,640 |
$26,564
390,082
kWh
|
$7,369
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,247 | $63,960 |
$21,076
309,491
kWh
|
$7,171
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $17,505 | - |
$(-1,845.0)
(-27,093)
kWh
|
- |
$16,650
-
MMBtu
|
- | - | $2,700 | |
| 04 | 3.4155: Meter waste water | $15,491 | $1,100 | - | - | - |
$15,491
-
Tgal
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $11,036 | $28,000 |
$1,236
18,149
kWh
|
- | - | - | $9,800 | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $4,257 | $14,220 |
$4,257
62,500
kWh
|
- | - | - | - | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,111 | $3,350 |
$2,350
34,536
kWh
|
$761
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.4151: Develop a repair/replace policy | $2,464 | $7,410 |
$2,370
35,328
kWh
|
$94
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,975 | $63 |
$1,975
28,999
kWh
|
- | - | - | - | - | |
| 10 | 2.4237: Substitute compressed air cooling with water or air cooling | $525 | $1,600 |
$525
7,713
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $118,544 | $135,343 |
$58,508
859,705
kWh
|
$15,395
-
kW-mo/yr
|
$16,650
-
MMBtu
|
$15,491
-
Tgal
|
$9,800 | $2,700 | ||
| TOTAL IMPLEMENTED | $76,327 | $110,950 |
$51,226
752,258
kWh
|
$15,301
-
kW-mo/yr
|
- | - | $9,800 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs