ITAC Assessment: TT0287
ITAC logo
ITAC Assessment: TT0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic Closures
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 265,450
ft2
Annual Production 26,212,175
lb
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,148,826 17,334,230
kWh
Electricity Demand $437,429 29,472
kW-mo/yr
Electricity Fees $29,657 -
Natural Gas $53,305 4,002
MMBtu
Waste Disposal Costs
Water Usage $33,070 8,404
Tgal
Water Disposal $91,798 8,404
Tgal
TOTAL YEARLY COSTS $1,794,085
RECOMMENDED SAVINGS* $82,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $23,724 $60 - - - $23,724
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,633 $1,785 $15,633
235,789
kWh
- - -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $10,858 $7,500 $8,231
124,158
kWh
$2,627
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $8,231 $3,100 $3,244
48,929
kWh
$4,987
-
kW-mo/yr
- -
05 2.7241: Install outside air damper / economizer on hvac unit $5,905 $1,050 $5,905
89,072
kWh
- - -
06 2.9114: Use solar heat to make electricty $5,202 $21,100 $5,202
78,813
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,887 $113 $3,887
58,632
kWh
- - -
08 2.2621: Modify refrigeration system to operate at a lower pressure $2,558 $3,750 $1,935
29,192
kWh
$623
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $2,170 $7,500 $2,170
32,732
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,966 $6,750 $1,966
29,652
kWh
- - -
11 2.7224: Reduce space conditioning during non-working hours $1,643 $100 $1,643
24,780
kWh
- - -
12 2.7231: Use radiant heater for spot heating $907 $2,724 - - $907
-
MMBtu
-
TOTAL RECOMMENDED $82,684 $55,532 $49,816
751,749
kWh
$8,237
-
kW-mo/yr
$907
-
MMBtu
$23,724
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs