ITAC Assessment: TT0282
ITAC logo
ITAC Assessment: TT0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Yeast
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 66,828
ft2
Annual Production 94,267,981
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,556,196 25,511,000
kWh
Electricity Demand $611,820 51,565
kW-mo/yr
Natural Gas $390,272 84,087
MMBtu
Waste Disposal Costs
Water Usage $149,909 89,953
Tgal
Water Disposal $1,840,081 192,091
Tgal
TOTAL YEARLY COSTS $4,548,278
RECOMMENDED SAVINGS* $1,422,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,323,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $816,618 $2,873,364 $683,845
11,210,566
kWh
$173,597
-
kW-mo/yr
$43,477
-
MMBtu
$(-84,301.0)
02 2.2437: Recover waste heat from equipment $360,908 $51,360 $263,271
4,315,924
kWh
- $97,637
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $99,184 $280,000 $78,754
1,291,052
kWh
- $20,430
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $48,725 $152,000 $48,725
798,782
kWh
- - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $42,363 $21,260 $42,363
694,483
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,290 $58,960 $41,290
676,887
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,200 $15,000 $10,424
170,895
kWh
$2,776
-
kW-mo/yr
- -
08 2.4237: Substitute compressed air cooling with water or air cooling $542 $1,120 $542
8,971
kWh
- - -
TOTAL RECOMMENDED $1,422,830 $3,453,064 $1,169,214
19,167,560
kWh
$176,373
-
kW-mo/yr
$161,544
-
MMBtu
$(-84,301.0)
TOTAL IMPLEMENTED $1,323,104 $3,171,944 $1,089,918
17,867,537
kWh
$176,373
-
kW-mo/yr
$141,114
-
MMBtu
$(-84,301.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs