ITAC Assessment: BS0008
ITAC logo
ITAC Assessment: BS0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pulse Crops
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 46,425
ft2
Annual Production 660,000
ton
Production Hrs. Annual 2,200
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,285 355,680
kWh
Electricity Demand $12,877 2,464
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.463: Modify facility to avoid excess maintenance costs $9,360 $350 - - $9,360
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,298 $14,400 $3,298
52,640
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $1,079 $117 $1,079
17,320
kWh
- -
04 2.7134: Use photocell controls $427 $227 $427
6,813
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $475 $15 $327
5,191
kWh
$148
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,639 $15,109 $5,131
81,964
kWh
$148
-
kW-mo/yr
$9,360
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs