ITAC Assessment: MO0085
ITAC logo
ITAC Assessment: MO0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Foam and Rigid Cellular Glass Insula
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 212,482
ft2
Annual Production 43,800,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,035,825 23,889,508
kWh
Natural Gas $1,256,564 559,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $13,076 $29,223 $13,076
301,583
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,889 $2,140 $2,889
66,530
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $962 $398 $962
22,274
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,575 $11,052 $4,575
105,510
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,509 $504 $2,509
58,030
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,151 $1,835 $4,151
138,921
kWh
07 2.4221: Install compressor air intakes in coolest locations $2,776 $366 $2,776
82,356
kWh
TOTAL RECOMMENDED $30,938 $45,518 $30,938
775,204
kWh
TOTAL IMPLEMENTED $29,976 $45,120 $29,976
752,930
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs