ITAC Assessment: TT0270
ITAC logo
ITAC Assessment: TT0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Kayaks
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 123
Plant Area 330,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,519 1,633,087
kWh
Electricity Demand $89,547 6,441
kW-mo/yr
Natural Gas $242,873 27,853
MMBtu
TOTAL YEARLY COSTS $447,939
RECOMMENDED SAVINGS* $23,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,427 $2,000 - $10,427
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $5,525 $50 - - $5,525
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,877 $2,770 $2,877
40,517
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,829 $40 $1,829
25,761
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,201 $2,240 $1,201
16,910
kWh
- -
06 2.9113: Use solar heat for heat $1,092 $4,800 $1,092
15,376
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $881 $1,200 $881
12,414
kWh
- -
TOTAL RECOMMENDED $23,832 $13,100 $7,880
110,978
kWh
$10,427
-
kW-mo/yr
$5,525
-
MMBtu
TOTAL IMPLEMENTED $18,829 $4,820 $2,877
40,517
kWh
$10,427
-
kW-mo/yr
$5,525
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs