Assessment Year | 2022 |
---|---|
Principal Product | Kayaks |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 123 |
Plant Area |
330,000
ft2
|
Annual Production | 20,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,519 | 1,633,087 |
kWh
|
$0.071 |
Electricity Demand | $89,547 | 6,441 |
kW-mo/yr
|
$13.90 |
Natural Gas | $242,873 | 27,853 |
MMBtu
|
$8.72 |
TOTAL YEARLY COSTS | $447,939 | |||
RECOMMENDED SAVINGS* | $23,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,829 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,427 | $2,000 | - |
$10,427
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $5,525 | $50 | - | - |
$5,525
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,877 | $2,770 |
$2,877
40,517
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,829 | $40 |
$1,829
25,761
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,201 | $2,240 |
$1,201
16,910
kWh
|
- | - | |
06 | 2.9113: Use solar heat for heat | $1,092 | $4,800 |
$1,092
15,376
kWh
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $881 | $1,200 |
$881
12,414
kWh
|
- | - | |
TOTAL RECOMMENDED | $23,832 | $13,100 |
$7,880
110,978
kWh
|
$10,427
-
kW-mo/yr
|
$5,525
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,829 | $4,820 |
$2,877
40,517
kWh
|
$10,427
-
kW-mo/yr
|
$5,525
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs