ITAC Assessment: TT0256
ITAC logo
ITAC Assessment: TT0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Natural Gas Distribution Pipe - HDPE
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 45,600
ft2
Annual Production 36
ton
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,309 8,408,400
kWh
Electricity Demand $262,390 17,629
kW-mo/yr
Natural Gas $6,384 512
MMBtu
Waste Disposal Costs
Water Usage $6,490 23,115
Tgal
TOTAL YEARLY COSTS $792,573
RECOMMENDED SAVINGS* $62,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,092 $12,000 $18,092
293,000
kWh
- - -
02 3.4155: Meter waste water $10,722 $2,150 - - - $10,722
-
Tgal
03 2.2437: Recover waste heat from equipment $5,816 $5,000 - - $5,816
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,560 $150 $5,560
94,341
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,866 $29,886 $4,406
71,639
kWh
$1,461
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $825 $3,000 $620
10,074
kWh
$205
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $1,460 $250 $625
10,162
kWh
- $835
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $605 $40 $605
9,838
kWh
- - -
09 2.7135: Install occupancy sensors $2,540 $588 $2,540
41,296
kWh
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,667 $2,040 $10,667
173,448
kWh
- - -
TOTAL RECOMMENDED $62,153 $55,104 $43,114
703,798
kWh
$1,666
-
kW-mo/yr
$6,651
-
MMBtu
$10,722
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs