Assessment Year | 2021 |
---|---|
Principal Product | Railroad Axle Bearings |
NAICS | 336510: Railroad Rolling Stock Manufacturing |
SIC | 3743: Railroad Equipment |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
135,000
ft2
|
Annual Production | 200,000
units
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $82,449 | 1,207,152 |
kWh
|
$0.068 | |
Electricity Demand | $80,134 | 5,857 |
kW-mo/yr
|
$13.68 | |
Electricity Fees | $166,179 | - |
|
- | |
Natural Gas | $38,968 | 4,181 |
MMBtu
|
$9.32 | |
Waste Disposal Costs | |||||
Water Usage | $2,947 | 456 |
Tgal
|
$6.46 | |
TOTAL YEARLY COSTS | $370,677 | ||||
RECOMMENDED SAVINGS* | $103,620 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $85,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6112: Use filter and drying oven to reduce sludge volume | $63,457 | $40,000 | - | - | - | $63,457 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,898 | $70,582 | - | $20,898 | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,036 | $3,000 | - | $10,036 | - | - | |
04 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $7,829 | $1,408 | - | - |
$7,829
-
MMBtu
|
- | |
05 | 2.7261: Install timers and/or thermostats | $479 | $900 | - | $479 | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $395 | $40 |
$395
5,778
kWh
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $281 | $500 | - | $281 | - | - | |
08 | 2.6218: Turn off equipment when not in use | $245 | $25 | - | $245 | - | - | |
TOTAL RECOMMENDED | $103,620 | $116,455 |
$395
5,778
kWh
|
$31,939 |
$7,829
-
MMBtu
|
$63,457 | ||
TOTAL IMPLEMENTED | $85,360 | $112,007 | - | $21,903 | - | $63,457 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs