ITAC Assessment: TT0252
ITAC logo
ITAC Assessment: TT0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Suspension components, exhaust manifolds and brackets
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 240,000
ft2
Annual Production 4,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,146,876 16,638,001
kWh
Electricity Demand $231,155 33,188
kW-mo/yr
Natural Gas $24,737 4,243
MMBtu
Waste Disposal Costs
Water Usage $12,710 1,988
Tgal
Water Disposal $3,235 425
Tgal
TOTAL YEARLY COSTS $1,418,713
RECOMMENDED SAVINGS* $62,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,977 $21,240 $24,977
362,357
kWh
- - -
02 2.2437: Recover waste heat from equipment $12,310 $29,594 - - $6,082
-
MMBtu
$6,228
-
Tgal
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,938 $40 $11,938
173,188
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,034 $59,439 $5,300
76,895
kWh
$734
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,906 $150 $3,906
56,667
kWh
- - -
06 2.7261: Install timers and/or thermostats $1,974 $1,100 $1,535
22,272
kWh
- $439
-
MMBtu
-
07 2.2426: Use waste heat from flue gases to heat space conditioning air $1,300 $2,500 - - $1,300
-
MMBtu
-
TOTAL RECOMMENDED $62,439 $114,063 $47,656
691,379
kWh
$734
-
kW-mo/yr
$7,822
-
MMBtu
$6,228
-
Tgal
TOTAL IMPLEMENTED $21,878 $59,629 $21,144
306,750
kWh
$734
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings