ITAC Assessment: SD0413
ITAC logo
ITAC Assessment: SD0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Biopharmaceuticals
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 633
Plant Area 274,364
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $558,011 6,978,347
kWh
Electricity Demand $238,069 13,602
kW-mo/yr
Electricity Fees $12,109 -
Natural Gas $874,011 90,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $370,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $188,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $151,192 $1,125,000 $332,880
4,161,000
kWh
$105,015
-
kW-mo/yr
$(-37,479.0) $(-249,224.0)
-
MMBtu
-
02 2.7425: Clean or color roof to reduce solar load $57,036 $120,000 $33,256
415,698
kWh
$23,780
-
kW-mo/yr
- - -
03 2.4323: Use optimum size and capacity equipment $31,920 $13,200 $24,017
300,219
kWh
$7,903
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,991 $20,850 $27,991
349,885
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,118 $9,600 $11,063
138,282
kWh
- - - $15,055
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,623 $13,300 $17,623
220,284
kWh
- - - -
07 2.7241: Install outside air damper / economizer on hvac unit $16,800 $2,000 $16,800
168,000
kWh
- - - -
08 2.4133: Use most efficient type of electric motors $10,905 $13,511 $8,253
103,158
kWh
$2,652
-
kW-mo/yr
- - -
09 2.2414: Use waste heat from hot flue gases to preheat $25,825 $17,794 $(-2,241.0)
(-28,007)
kWh
$(-671.0)
-
kW-mo/yr
- $28,737
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $2,202 - $2,202
27,529
kWh
- - - -
11 2.7132: Install timers on light switches in little used areas $1,764 $1,725 $1,764
22,052
kWh
- - - -
12 2.3132: Recharge batteries on during off-peak demand periods $992 - - - $992 - -
TOTAL RECOMMENDED $370,368 $1,336,980 $473,608
5,878,100
kWh
$138,679
-
kW-mo/yr
$(-36,487.0) $(-220,487.0)
-
MMBtu
$15,055
-
Tgal
TOTAL IMPLEMENTED $188,393 $192,461 $139,003
1,695,526
kWh
$34,335
-
kW-mo/yr
- - $15,055
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs