ITAC Assessment: TT0245
ITAC logo
ITAC Assessment: TT0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Power Poles
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 115,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,021 2,563,000
kWh
Electricity Demand $82,135 7,562
kW-mo/yr
Natural Gas $52,648 7,579
MMBtu
Waste Disposal Costs
Water Usage $1,247 4,957
Tgal
Water Disposal $2,528 4,957
Tgal
TOTAL YEARLY COSTS $295,579
RECOMMENDED SAVINGS* $15,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,084 $1,500 $7,695
125,611
kWh
$2,389
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,143 $150 $2,143
34,979
kWh
- -
03 2.2437: Recover waste heat from equipment $1,789 $4,500 - - $1,789
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,356 $900 $1,356
22,131
kWh
- -
TOTAL RECOMMENDED $15,372 $7,050 $11,194
182,721
kWh
$2,389
-
kW-mo/yr
$1,789
-
MMBtu
TOTAL IMPLEMENTED $12,227 $1,650 $9,838
160,590
kWh
$2,389
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs