Assessment Year | 2021 |
---|---|
Principal Product | vehicle headlights/tailights |
NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
SIC | 3647: Vehicular Lighting Equipment |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
152,000
ft2
|
Annual Production | 2,700,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $668,222 | 16,049,831 |
kWh
|
$0.042 | |
Electricity Demand | $560,178 | 80,960 |
kW-mo/yr
|
$6.92 | |
Natural Gas | $126,663 | 18,274 |
MMBtu
|
$6.93 | |
Waste Disposal Costs | |||||
Water Usage | $9,462 | 28,567 |
Tgal
|
$0.33 | |
Water Disposal | $14,328 | 28,567 |
Tgal
|
$0.50 | |
TOTAL YEARLY COSTS | $1,378,853 | ||||
RECOMMENDED SAVINGS* | $129,213 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $101,991 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $97,307 | $190,198 |
$76,829
1,846,855
kWh
|
$20,478
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $16,484 | $39,000 | - | - | - | $16,484 | |
03 | 2.2437: Recover waste heat from equipment | $5,714 | $15,000 | - | - |
$5,714
-
MMBtu
|
- | |
04 | 2.7261: Install timers and/or thermostats | $4,684 | $200 |
$1,981
47,610
kWh
|
- |
$2,703
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,956 | $275 |
$2,956
71,090
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,937 | $40 |
$1,937
46,560
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $131 | $167 | - | - |
$131
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $129,213 | $244,880 |
$83,703
2,012,115
kWh
|
$20,478
-
kW-mo/yr
|
$8,548
-
MMBtu
|
$16,484 | ||
TOTAL IMPLEMENTED | $101,991 | $190,398 |
$78,810
1,894,465
kWh
|
$20,478
-
kW-mo/yr
|
$2,703
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs