ITAC Assessment: TT0241
ITAC logo
ITAC Assessment: TT0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Jars
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 400,000
ft2
Annual Production 36,400,000
units
Production Hrs. Annual 7,320
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $580,993 12,398,000
kWh
Electricity Demand $493,644 26,474
kW-mo/yr
Natural Gas $18,356 2,497
MMBtu
Waste Disposal Costs
Water Usage $11,788 4,351
Tgal
Water Disposal $18,280 4,351
Tgal
TOTAL YEARLY COSTS $1,123,061
RECOMMENDED SAVINGS* $260,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $116,047 $13,220 $104,436
2,226,775
kWh
$11,611
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $54,178 $300 $32,635
695,845
kWh
$21,543
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $49,818 $14,600 - $49,818
-
kW-mo/yr
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $18,441 $75,000 $18,441
393,192
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $8,106 $530 $8,106
172,837
kWh
- -
06 2.4224: Upgrade controls on compressors $4,203 $120 $2,278
48,611
kWh
$1,925
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,304 $3,360 $2,663
56,788
kWh
$640
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,202 $20 $1,814
38,688
kWh
$1,387
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,651 $6,000 $2,651
56,518
kWh
- -
10 2.1113: Reduce combustion air flow to optimum $404 $1,000 - - $404
-
MMBtu
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $307 $680 $302
6,443
kWh
$5
-
kW-mo/yr
-
12 2.2136: Install / repair insulation on steam lines $74 $269 $74
1,584
kWh
- -
TOTAL RECOMMENDED $260,735 $115,099 $173,401
3,697,280
kWh
$86,930
-
kW-mo/yr
$404
-
MMBtu
TOTAL IMPLEMENTED $140,485 $101,759 $66,687
1,421,894
kWh
$73,394
-
kW-mo/yr
$404
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs