ITAC Assessment: TT0235
ITAC logo
ITAC Assessment: TT0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Nylon and Plastic Assemblies
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 144,695
ft2
Annual Production 51,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,290 5,339,455
kWh
Electricity Demand $189,615 10,302
kW-mo/yr
Natural Gas $91,635 26,786
MMBtu
Waste Disposal Costs
Water Usage $24,035 3,501
Tgal
Water Disposal $24,035 3,501
Tgal
TOTAL YEARLY COSTS $659,610
RECOMMENDED SAVINGS* $152,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $64,019 $180,485 $40,355
651,932
kWh
$23,664
-
kW-mo/yr
- -
02 4.812: Apply for investment incentives $51,142 $11,500 - - - $51,142
03 2.3212: Optimize plant power factor $24,204 $32,000 - $24,204
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $4,885 $12,000 $4,885
78,929
kWh
- - -
05 4.812: Apply for investment incentives $4,581 $120 - - - $4,581
06 2.2511: Insulate bare equipment $3,534 $9,920 - - $3,534
-
MMBtu
-
TOTAL RECOMMENDED $152,365 $246,025 $45,240
730,861
kWh
$47,868
-
kW-mo/yr
$3,534
-
MMBtu
$55,723
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs