Assessment Year | 2019 |
---|---|
Principal Product | BOPP film |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
475,142
ft2
|
Annual Production | 108,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,418,895 | 68,791,081 |
kWh
|
$0.035 | |
Electricity Demand | $1,331,717 | 116,412 |
kW-mo/yr
|
$11.44 | |
Natural Gas | $1,311,055 | 243,895 |
MMBtu
|
$5.38 | |
Waste Disposal Costs | |||||
Water Usage | $58,741 | 28,102 |
Tgal
|
$2.09 | |
Water Disposal | $154,060 | 12,208 |
Tgal
|
$12.62 | |
TOTAL YEARLY COSTS | $5,274,468 | ||||
RECOMMENDED SAVINGS* | $81,213 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $22,260 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $38,442 | $48,190 |
$22,135
629,551
kWh
|
- | - | - | $10,179 | $6,128 | |
02 | 2.3212: Optimize plant power factor | $22,260 | $107,529 | - | - | $22,260 | - | - | - | |
03 | 2.4224: Upgrade controls on compressors | $9,856 | $40 |
$9,856
280,320
kWh
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,941 | $22,500 |
$5,941
168,063
kWh
|
- | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,375 | $3,375 |
$2,339
66,549
kWh
|
$1,036
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $1,339 | $1,060 | - | - | - |
$1,339
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $81,213 | $182,694 |
$40,271
1,144,483
kWh
|
$1,036
-
kW-mo/yr
|
$22,260 |
$1,339
-
MMBtu
|
$10,179 | $6,128 | ||
TOTAL IMPLEMENTED | $22,260 | $107,529 | - | - | $22,260 | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs