Assessment Year | 2019 |
---|---|
Principal Product | Automotive Door Handles |
NAICS | 332510: Hardware Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
185,660
ft2
|
Annual Production | 2,500,000
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $749,451 | 11,252,480 |
kWh
|
$0.067 | |
Electricity Demand | $319,163 | 26,739 |
kW-mo/yr
|
$11.94 | |
Natural Gas | $91,925 | 22,866 |
MMBtu
|
$4.02 | |
Waste Disposal Costs | |||||
Water Usage | $6,973 | 755 |
Tgal
|
$9.24 | |
Water Disposal | $8,510 | 756 |
Tgal
|
$11.26 | |
TOTAL YEARLY COSTS | $1,176,022 | ||||
RECOMMENDED SAVINGS* | $65,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $65,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,957 | $153,710 |
$29,376
441,075
kWh
|
$13,581
-
kW-mo/yr
|
|
02 | 2.4225: Install common header on compressors | $13,982 | $1,050 |
$13,982
209,936
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $4,149 | $10,500 |
$4,149
62,297
kWh
|
- | |
04 | 2.6218: Turn off equipment when not in use | $3,033 | $25 |
$3,033
45,533
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $886 | $40 |
$886
13,293
kWh
|
- | |
06 | 2.7212: Install or upgrade insulation on hvac distribution systems | $650 | $1,650 |
$650
9,758
kWh
|
- | |
TOTAL RECOMMENDED | $65,657 | $166,975 |
$52,076
781,892
kWh
|
$13,581
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $65,657 | $166,975 |
$52,076
781,892
kWh
|
$13,581
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs