ITAC Assessment: TT0228
ITAC logo
ITAC Assessment: TT0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Jackets and Bibs
NAICS 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing
SIC 2326: Men's and Boys' Work Clothing
Sales Range $50
M
to 100
M
# of Employees 196
Plant Area 78,000
ft2
Annual Production 370,673
units
Production Hrs. Annual 2,100
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,367 1,029,120
kWh
Electricity Demand $52,762 4,956
kW-mo/yr
Natural Gas $8,102 812
MMBtu
Waste Disposal Costs
Water Usage $3,667 214
Tgal
Water Disposal $1,713 214
Tgal
TOTAL YEARLY COSTS $139,611
RECOMMENDED SAVINGS* $17,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,113 $17,840 $7,113
99,762
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,538 $4,300 $4,235
59,404
kWh
$1,303
-
kW-mo/yr
03 2.7261: Install timers and/or thermostats $1,880 $100 $1,880
26,368
kWh
-
04 2.7231: Use radiant heater for spot heating $1,438 $1,100 $1,438
20,168
kWh
-
05 2.7241: Install outside air damper / economizer on hvac unit $1,351 $1,100 $1,351
18,953
kWh
-
TOTAL RECOMMENDED $17,320 $24,440 $16,017
224,655
kWh
$1,303
-
kW-mo/yr
TOTAL IMPLEMENTED $15,882 $23,340 $14,579
204,487
kWh
$1,303
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs