ITAC Assessment: TT0207
ITAC logo
ITAC Assessment: TT0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Germanium and Charged Particle Detectors
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 41,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 6,188
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,433 5,265,000
kWh
Electricity Demand $138,788 9,035
kW-mo/yr
Natural Gas $41,859 5,597
MMBtu
Waste Disposal Costs
Water Usage $53,537 9,736,000
Tgal
Water Disposal $59,396 9,736
Tgal
TOTAL YEARLY COSTS $631,013
RECOMMENDED SAVINGS* $28,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,878 $41,788 $12,894
201,154
kWh
$5,984
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,922 $9,020 $3,706
57,816
kWh
$1,216
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,589 $2,450 $1,915
29,879
kWh
$674
-
kW-mo/yr
04 2.2694: Use highest temperature for chilling or cold storage $1,313 $250 $1,313
20,478
kWh
-
05 2.4226: Use / purchase optimum sized compressor $618 $1,770 $618
9,636
kWh
-
TOTAL RECOMMENDED $28,320 $55,278 $20,446
318,963
kWh
$7,874
-
kW-mo/yr
TOTAL IMPLEMENTED $21,467 $44,238 $14,809
231,033
kWh
$6,658
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs