| Assessment Year | 2018 |
|---|---|
| Principal Product | Germanium and Charged Particle Detectors |
| NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
| SIC | 3826: Laboratory Analytical Instruments |
| Sales Range | $50 M to 100M |
| # of Employees | 75 |
| Plant Area |
41,000
ft2
|
| Annual Production | 2,000
units
|
| Production Hrs. Annual | 6,188
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $337,433 | 5,265,000 |
kWh
|
$0.064 | |
| Electricity Demand | $138,788 | 9,035 |
kW-mo/yr
|
$15.36 | |
| Natural Gas | $41,859 | 5,597 |
MMBtu
|
$7.48 | |
| Waste Disposal Costs | |||||
| Water Usage | $53,537 | 9,736,000 |
Tgal
|
$0.005 | |
| Water Disposal | $59,396 | 9,736 |
Tgal
|
$6.10 | |
| TOTAL YEARLY COSTS | $631,013 | ||||
| RECOMMENDED SAVINGS* | $28,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $21,467 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,878 | $41,788 |
$12,894
201,154
kWh
|
$5,984
-
kW-mo/yr
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,922 | $9,020 |
$3,706
57,816
kWh
|
$1,216
-
kW-mo/yr
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,589 | $2,450 |
$1,915
29,879
kWh
|
$674
-
kW-mo/yr
|
|
| 04 | 2.2694: Use highest temperature for chilling or cold storage | $1,313 | $250 |
$1,313
20,478
kWh
|
- | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $618 | $1,770 |
$618
9,636
kWh
|
- | |
| TOTAL RECOMMENDED | $28,320 | $55,278 |
$20,446
318,963
kWh
|
$7,874
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $21,467 | $44,238 |
$14,809
231,033
kWh
|
$6,658
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs