| Assessment Year | 1997 |
|---|---|
| Principal Product | beer |
| NAICS |
n/a
|
| SIC | 2082: Malt Beverages |
| Sales Range | $5 M to 10M |
| # of Employees | 175 |
| Plant Area |
30,000
ft2
|
| Annual Production | 160,260
Tgal
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,101 | 1,001,465 |
kWh
|
$0.019 |
| Electricity Demand | $27,852 | 1,902 |
kW-mo/yr
|
$14.64 |
| Electricity Fees | $312 | - |
|
- |
| Natural Gas | $10,321 | 2,607 |
MMBtu
|
$3.96 |
| Other Energy | $38,508 | 4,866 |
MMBtu
|
$7.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,072 | $6,685 |
$2,952
148,007
kWh
|
$3,120
-
kW-mo/yr
|
- | - | |
| 02 | 2.2623: Minimize condenser cooling water temperature | $1,790 | $2,000 |
$280
14,654
kWh
|
$300
-
kW-mo/yr
|
$1,210
-
MMBtu
|
- | |
| 03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,180 | - |
$210
11,137
kWh
|
$970
-
kW-mo/yr
|
- | - | |
| 04 | 2.2135: Repair and eliminate steam leaks | $380 | $300 | - | - |
$380
-
MMBtu
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $280 | $810 | - | - |
$280
-
MMBtu
|
- | |
| 06 | 4.452: Eliminate shift | $3,120 | - | - | - | - | $3,120 | |
| TOTAL RECOMMENDED | $12,822 | $9,795 |
$3,442
173,798
kWh
|
$4,390
-
kW-mo/yr
|
$1,870
-
MMBtu
|
$3,120 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs