ITAC Assessment: CO0403
ITAC logo
ITAC Assessment: CO0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 175
Plant Area 30,000
ft2
Annual Production 160,260
Tgal
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,101 1,001,465
kWh
Electricity Demand $27,852 1,902
kW-mo/yr
Electricity Fees $312 -
Natural Gas $10,321 2,607
MMBtu
Other Energy $38,508 4,866
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,072 $6,685 $2,952
148,007
kWh
$3,120
-
kW-mo/yr
- -
02 2.2623: Minimize condenser cooling water temperature $1,790 $2,000 $280
14,654
kWh
$300
-
kW-mo/yr
$1,210
-
MMBtu
-
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,180 - $210
11,137
kWh
$970
-
kW-mo/yr
- -
04 2.2135: Repair and eliminate steam leaks $380 $300 - - $380
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $280 $810 - - $280
-
MMBtu
-
06 4.452: Eliminate shift $3,120 - - - - $3,120
TOTAL RECOMMENDED $12,822 $9,795 $3,442
173,798
kWh
$4,390
-
kW-mo/yr
$1,870
-
MMBtu
$3,120
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs