Assessment Year | 1997 |
---|---|
Principal Product | beer |
NAICS |
n/a
|
SIC | 2082: Malt Beverages |
Sales Range | $5 M to 10M |
# of Employees | 175 |
Plant Area |
30,000
ft2
|
Annual Production | 160,260
Tgal
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,101 | 1,001,465 |
kWh
|
$0.019 |
Electricity Demand | $27,852 | 1,902 |
kW-mo/yr
|
$14.64 |
Electricity Fees | $312 | - |
|
- |
Natural Gas | $10,321 | 2,607 |
MMBtu
|
$3.96 |
Other Energy | $38,508 | 4,866 |
MMBtu
|
$7.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,072 | $6,685 |
$2,952
148,007
kWh
|
$3,120
-
kW-mo/yr
|
- | - | |
02 | 2.2623: Minimize condenser cooling water temperature | $1,790 | $2,000 |
$280
14,654
kWh
|
$300
-
kW-mo/yr
|
$1,210
-
MMBtu
|
- | |
03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,180 | - |
$210
11,137
kWh
|
$970
-
kW-mo/yr
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $380 | $300 | - | - |
$380
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $280 | $810 | - | - |
$280
-
MMBtu
|
- | |
06 | 4.452: Eliminate shift | $3,120 | - | - | - | - | $3,120 | |
TOTAL RECOMMENDED | $12,822 | $9,795 |
$3,442
173,798
kWh
|
$4,390
-
kW-mo/yr
|
$1,870
-
MMBtu
|
$3,120 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs