| Assessment Year | 2017 |
|---|---|
| Principal Product | Hardwood Flooring |
| NAICS | 321918: Other Millwork (including Flooring) |
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
205,000
ft2
|
| Annual Production | 2,000,000
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $200,006 | 3,177,900 |
kWh
|
$0.063 | |
| Electricity Demand | $206,198 | 13,091 |
kW-mo/yr
|
$15.75 | |
| Natural Gas | $26,295 | 2,578 |
MMBtu
|
$10.20 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,235 | 14,743,000 |
Tgal
|
$0.000 | |
| Water Disposal | $11,197 | 14,743 |
Tgal
|
$0.76 | |
| TOTAL YEARLY COSTS | $450,931 | ||||
| RECOMMENDED SAVINGS* | $37,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $20,808 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,177 | $3,050 |
$12,177
193,596
kWh
|
- | - | |
| 02 | 2.4224: Upgrade controls on compressors | $11,026 | $14,000 |
$8,210
130,524
kWh
|
$2,816
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,767 | $4,837 |
$6,993
111,191
kWh
|
$774
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,128 | $125 |
$3,818
60,699
kWh
|
$1,310
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $864 | $2,140 | - | - |
$864
-
MMBtu
|
|
| 06 | 2.2162: Reduce excess steam bleeding | $224 | $225 | - | - |
$224
-
MMBtu
|
|
| TOTAL RECOMMENDED | $37,186 | $24,377 |
$31,198
496,010
kWh
|
$4,900
-
kW-mo/yr
|
$1,088
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,808 | $10,027 |
$19,170
304,787
kWh
|
$774
-
kW-mo/yr
|
$864
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs