Assessment Year | 2017 |
---|---|
Principal Product | Distilled Water Bottle Preparations |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 485 |
Plant Area |
800,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,234,527 | 46,070,640 |
kWh
|
$0.027 | |
Electricity Demand | $840,228 | 80,023 |
kW-mo/yr
|
$10.50 | |
Natural Gas | $796,749 | 236,375 |
MMBtu
|
$3.37 | |
Waste Disposal Costs | |||||
Water Usage | $10,545 | 150,635 |
Tgal
|
$0.070 | |
TOTAL YEARLY COSTS | $2,882,049 | ||||
RECOMMENDED SAVINGS* | $191,659 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $104,656 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $77,734 | $24,500 | - | - |
$1,144
-
MMBtu
|
$2,590
-
Tgal
|
$74,000 | |
02 | 2.2121: Increase amount of condensate returned | $52,000 | $14,250 | - | - |
$30,000
-
MMBtu
|
$742
-
Tgal
|
$21,258 | |
03 | 2.4224: Upgrade controls on compressors | $24,005 | $30,000 |
$22,797
844,261
kWh
|
$1,208
-
kW-mo/yr
|
- | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,000 | $3,000 | - | - |
$19,000
-
MMBtu
|
- | - | |
05 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $8,095 | $1,311 | - | - |
$2,173
-
MMBtu
|
$200
-
Tgal
|
$5,722 | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $6,126 | $2,000 |
$6,126
228,597
kWh
|
- | - | - | - | |
07 | 2.4131: Size electric motors for peak operating efficiency | $2,097 | $1,000 |
$2,097
77,661
kWh
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,556 | - |
$1,556
57,653
kWh
|
- | - | - | - | |
09 | 2.4224: Upgrade controls on compressors | $1,046 | $3,200 |
$1,046
38,772
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $191,659 | $79,261 |
$33,622
1,246,944
kWh
|
$1,208
-
kW-mo/yr
|
$52,317
-
MMBtu
|
$3,532
-
Tgal
|
$100,980 | ||
TOTAL IMPLEMENTED | $104,656 | $48,561 |
$24,353
901,914
kWh
|
$1,208
-
kW-mo/yr
|
$51,173
-
MMBtu
|
$942
-
Tgal
|
$26,980 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs