ITAC Assessment: SU0346
ITAC logo
ITAC Assessment: SU0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Automotive Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range greater than $500
M
# of Employees 1,323
Plant Area 2,000,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 8,280
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,483,736 89,674,716
kWh
Electricity Demand $1,268,784 158,598
kW-mo/yr
Electricity Fees $166,153 -
Natural Gas $2,981,865 581,871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4314: Use synthetic lubricant $24,796 - $8,684
173,672
kWh
$16,112
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $119 - $119
2,384
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $9,608 $780 $6,251
125,028
kWh
$1,448
-
kW-mo/yr
$1,495 $414
04 2.4321: Upgrade obsolete equipment $304 $1,295 $248
4,968
kWh
$56
-
kW-mo/yr
- -
05 2.7122: Disconnect ballasts $4,434 $21,152 $3,602
72,036
kWh
$832
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,803 $8,868 $869
17,388
kWh
$200
-
kW-mo/yr
$390 $344
TOTAL RECOMMENDED $41,064 $32,095 $19,773
395,476
kWh
$18,648
-
kW-mo/yr
$1,885 $758
TOTAL IMPLEMENTED $31,456 $31,315 $13,522
270,448
kWh
$17,200
-
kW-mo/yr
$390 $344
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs