Assessment Year | 2017 |
---|---|
Principal Product | PET Bottles |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
307,000
ft2
|
Annual Production | 1,200,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,277,181 | 34,631,020 |
kWh
|
$0.037 | |
Electricity Demand | $673,219 | 120,074 |
kW-mo/yr
|
$5.61 | |
Natural Gas | $8,694 | 1,521 |
MMBtu
|
$5.72 | |
Waste Disposal Costs | |||||
Water Usage | $25,239 | 10,302,952 |
Tgal
|
$0.002 | |
Water Disposal | $44,743 | 8,624 |
Tgal
|
$5.19 | |
TOTAL YEARLY COSTS | $2,029,076 | ||||
RECOMMENDED SAVINGS* | $301,349 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $297,679 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $173,199 | $5,000 |
$143,359
3,885,060
kWh
|
$29,840
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $114,605 | $150,000 |
$94,860
2,570,721
kWh
|
$19,745
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,276 | $1,250 |
$5,195
140,773
kWh
|
$1,081
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,670 | $10,600 |
$3,038
82,344
kWh
|
$632
-
kW-mo/yr
|
- | |
05 | 4.812: Apply for investment incentives | $2,174 | $40 | - | - | $2,174 | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,425 | $1,425 |
$1,179
31,939
kWh
|
$246
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $301,349 | $168,315 |
$247,631
6,710,837
kWh
|
$51,544
-
kW-mo/yr
|
$2,174 | ||
TOTAL IMPLEMENTED | $297,679 | $157,715 |
$244,593
6,628,493
kWh
|
$50,912
-
kW-mo/yr
|
$2,174 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs