ITAC Assessment: IA0135
ITAC logo
ITAC Assessment: IA0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Grain handling equipment, Electric mobile vehicles
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 160,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 2,820
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,512 1,147,714
kWh
Natural Gas $32,117 7,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,026 $8,829 $4,026
49,531
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,842 $4,884 $3,842
47,479
kWh
- - -
03 2.7135: Install occupancy sensors $1,391 $2,910 $1,391
17,292
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $37 $46 $37
586
kWh
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,718 $9,049 $14,956
224,502
kWh
$(-3,238.0)
-
MMBtu
- -
06 2.4224: Upgrade controls on compressors $2,596 $200 $2,596
32,239
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $853 $268 $853
10,551
kWh
- - -
08 2.4133: Use most efficient type of electric motors $48 $236 $48
586
kWh
- - -
09 3.8132: Use less toxic and volatile solvent substitutes $4,217 - - - $4,217
-
gal
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $6,006 $7,400 - - - $6,006
-
lb
11 3.7198: Reduce / eliminate use of disposable product $882 $1,100 - - - $882
-
lb
12 3.1163: Use plastic pallets instead of wood $325 $400 - - - $325
-
lb
TOTAL RECOMMENDED $35,941 $35,322 $27,749
382,766
kWh
$(-3,238.0)
-
MMBtu
$4,217
-
gal
$7,213
-
lb
TOTAL IMPLEMENTED $21,187 $18,782 $19,883
285,170
kWh
$(-3,238.0)
-
MMBtu
$4,217
-
gal
$325
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs