ITAC Assessment: TT0178
ITAC logo
ITAC Assessment: TT0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Carbide Cutting Tools
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 38,915
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,554
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,859 1,153,343
kWh
Electricity Demand $13,750 2,625
kW-mo/yr
Natural Gas $3,455 563
MMBtu
Waste Disposal Costs
Water Usage $2,094 320,565
Tgal
TOTAL YEARLY COSTS $119,158
RECOMMENDED SAVINGS* $13,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,653 $3,050 $6,145
70,956
kWh
$508
-
kW-mo/yr
- -
02 4.812: Apply for investment incentives $4,193 $40 - - $4,193 -
03 2.7111: Reduce illumination to minimum necessary levels $1,598 $530 $1,405
13,999
kWh
$193
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $805 $250 $727
8,395
kWh
- - $78
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $332 $125 $306
3,539
kWh
$26
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $329 $600 $303
3,504
kWh
$26
-
kW-mo/yr
- -
TOTAL RECOMMENDED $13,910 $4,595 $8,886
100,393
kWh
$753
-
kW-mo/yr
$4,193 $78
-
MMBtu
TOTAL IMPLEMENTED $4,193 $40 - - $4,193 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs