ITAC Assessment: NL0003
ITAC logo
ITAC Assessment: NL0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product power distribution units
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 77,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,546 1,291,500
kWh
Electricity Demand $71,758 4,797
kW-mo/yr
Natural Gas $24,758 9,634
MMBtu
Waste Disposal Costs
Water Usage $2,504 998
Tgal
Water Disposal $2,480 998
Tgal
Solid Waste (non-haz) $45 4,324
lb
TOTAL YEARLY COSTS $139,091
RECOMMENDED SAVINGS* $7,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.2437: Recover waste heat from equipment $3,412 $15,000 - - $300
-
MMBtu
$3,112
02 2.2522: Isolate hot or cold equipment $1,797 $14,000 $278
9,600
kWh
$1,519
-
kW-mo/yr
- -
03 2.7446: Utilize sensors controlling roof and wall openings $1,586 $4,300 $122
4,200
kWh
$950
-
kW-mo/yr
$514
-
MMBtu
-
04 2.7135: Install occupancy sensors $348 $1,250 $348
11,800
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $200 $250 $200
6,896
kWh
- - -
TOTAL RECOMMENDED $7,343 $34,800 $948
32,496
kWh
$2,469
-
kW-mo/yr
$814
-
MMBtu
$3,112
TOTAL IMPLEMENTED $1,797 $14,000 $278
9,600
kWh
$1,519
-
kW-mo/yr
- -