| Assessment Year | 2017 |
|---|---|
| Principal Product | power distribution units |
| NAICS | 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing |
| SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
| Sales Range | $50 M to 100M |
| # of Employees | 140 |
| Plant Area |
77,000
ft2
|
| Annual Production | 3,000,000
units
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $37,546 | 1,291,500 |
kWh
|
$0.029 | |
| Electricity Demand | $71,758 | 4,797 |
kW-mo/yr
|
$14.96 | |
| Natural Gas | $24,758 | 9,634 |
MMBtu
|
$2.57 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,504 | 998 |
Tgal
|
$2.51 | |
| Water Disposal | $2,480 | 998 |
Tgal
|
$2.48 | |
| Solid Waste (non-haz) | $45 | 4,324 |
lb
|
$0.010 | |
| TOTAL YEARLY COSTS | $139,091 | ||||
| RECOMMENDED SAVINGS* | $7,343 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $1,797 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $3,412 | $15,000 | - | - |
$300
-
MMBtu
|
$3,112 | |
| 02 | 2.2522: Isolate hot or cold equipment | $1,797 | $14,000 |
$278
9,600
kWh
|
$1,519
-
kW-mo/yr
|
- | - | |
| 03 | 2.7446: Utilize sensors controlling roof and wall openings | $1,586 | $4,300 |
$122
4,200
kWh
|
$950
-
kW-mo/yr
|
$514
-
MMBtu
|
- | |
| 04 | 2.7135: Install occupancy sensors | $348 | $1,250 |
$348
11,800
kWh
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $200 | $250 |
$200
6,896
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $7,343 | $34,800 |
$948
32,496
kWh
|
$2,469
-
kW-mo/yr
|
$814
-
MMBtu
|
$3,112 | ||
| TOTAL IMPLEMENTED | $1,797 | $14,000 |
$278
9,600
kWh
|
$1,519
-
kW-mo/yr
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs