Assessment Year | 1998 |
---|---|
Principal Product | Roofing shingles |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
160,000
ft2
|
Annual Production | 300,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $374,973 | 7,199,004 |
kWh
|
$0.052 |
Electricity Demand | $84,937 | 13,189 |
kW-mo/yr
|
$6.44 |
Electricity Fees | $(-27,980.0) | - |
|
- |
Natural Gas | $525,923 | 107,827 |
MMBtu
|
$4.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $279,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,948 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,699 | $1,772 |
$1,444
27,843
kWh
|
$255
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,998 | $2,855 |
$2,998
57,444
kWh
|
- | - | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $5,530 | $400 |
$4,701
90,270
kWh
|
$829
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,996 | $26,726 |
$22,938
441,383
kWh
|
$4,058
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $18,420 | $500 |
$15,654
300,703
kWh
|
$2,766
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $23,449 | $8,140 | - | - |
$23,449
-
MMBtu
|
- | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $5,649 | $1,961 | - | - |
$5,649
-
MMBtu
|
- | - | - | - | |
08 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,031 | - | - | - | - |
$7,031
-
Tgal
|
- | - | - | |
09 | 3.4113: Treat and reuse rinse waters | $70,617 | $100,000 | - | - | - |
$70,617
-
Tgal
|
- | - | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $52,500 | $75,000 | - | - | - | - |
$60,000
-
lb
|
$(-7,500.0) | - | |
11 | 3.5313: Increase amount of waste recovered for resale | $12,000 | $500 | - | - | - | - |
$12,000
-
lb
|
- | - | |
12 | 4.211: Consider use / purchase of bulk materials where possible | $52,592 | $500 | - | - | - | - | - | - | $52,592 | |
TOTAL RECOMMENDED | $279,481 | $218,354 |
$47,735
917,643
kWh
|
$7,908
-
kW-mo/yr
|
$29,098
-
MMBtu
|
$77,648
-
Tgal
|
$72,000
-
lb
|
$(-7,500.0) | $52,592 | ||
TOTAL IMPLEMENTED | $26,948 | $3,755 |
$23,353
448,417
kWh
|
$3,595
-
kW-mo/yr
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs