Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Roofing shingles
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 160,000
ft2
Annual Production 300,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $374,973 7,199,004
kWh
Electricity Demand $84,937 13,189
kW-mo/yr
Electricity Fees $(-27,980.0) -
Natural Gas $525,923 107,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,948

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,699 $1,772 $1,444
27,843
kWh
$255
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $2,998 $2,855 $2,998
57,444
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $5,530 $400 $4,701
90,270
kWh
$829
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $26,996 $26,726 $22,938
441,383
kWh
$4,058
-
kW-mo/yr
- - - - -
05 2.7111: Reduce illumination to minimum necessary levels $18,420 $500 $15,654
300,703
kWh
$2,766
-
kW-mo/yr
- - - - -
06 2.2414: Use waste heat from hot flue gases to preheat $23,449 $8,140 - - $23,449
-
MMBtu
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $5,649 $1,961 - - $5,649
-
MMBtu
- - - -
08 3.4116: Meter recycled water (to reduce sewer charges) $7,031 - - - - $7,031
-
Tgal
- - -
09 3.4113: Treat and reuse rinse waters $70,617 $100,000 - - - $70,617
-
Tgal
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $52,500 $75,000 - - - - $60,000
-
lb
$(-7,500.0) -
11 3.5313: Increase amount of waste recovered for resale $12,000 $500 - - - - $12,000
-
lb
- -
12 4.211: Consider use / purchase of bulk materials where possible $52,592 $500 - - - - - - $52,592
TOTAL RECOMMENDED $279,481 $218,354 $47,735
917,643
kWh
$7,908
-
kW-mo/yr
$29,098
-
MMBtu
$77,648
-
Tgal
$72,000
-
lb
$(-7,500.0) $52,592
TOTAL IMPLEMENTED $26,948 $3,755 $23,353
448,417
kWh
$3,595
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings