Assessment Year | 2016 |
---|---|
Principal Product | remanufatured turbochargers |
NAICS | 333618: Other Engine Equipment Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 392 |
Plant Area |
140,000
ft2
|
Annual Production | 14,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $481,055 | 7,477,400 |
kWh
|
$0.064 |
Electricity Demand | $189,603 | 17,085 |
kW-mo/yr
|
$11.10 |
Natural Gas | $110,527 | 17,332 |
MMBtu
|
$6.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,272 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,961 | $156,286 |
$41,915
654,915
kWh
|
$1,172
-
kW-mo/yr
|
- | $6,874 | |
02 | 2.7425: Clean or color roof to reduce solar load | $16,670 | $105,000 |
$18,630
291,085
kWh
|
$3,080
-
kW-mo/yr
|
$(-5,040.0)
-
MMBtu
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $11,200 | $110,000 |
$2,895
45,227
kWh
|
$7,585
-
kW-mo/yr
|
$720
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,210 | - |
$6,210
97,033
kWh
|
- | - | - | |
05 | 2.4224: Upgrade controls on compressors | $2,435 | $800 |
$2,435
38,046
kWh
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $544 | $1,100 |
$544
8,503
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $676 | $1,366 |
$499
7,795
kWh
|
$177
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $87,696 | $374,552 |
$73,128
1,142,604
kWh
|
$12,014
-
kW-mo/yr
|
$(-4,320.0)
-
MMBtu
|
$6,874 | ||
TOTAL IMPLEMENTED | $64,272 | $268,452 |
$47,744
745,983
kWh
|
$8,934
-
kW-mo/yr
|
$720
-
MMBtu
|
$6,874 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs