ITAC Assessment: TT0169
ITAC logo
ITAC Assessment: TT0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Catalysts and Additives
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 86
Plant Area 300,000
ft2
Annual Production 2,319
ton
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $402,577 8,817,737
kWh
Electricity Demand $235,841 22,410
kW-mo/yr
Natural Gas $149,213 51,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,315 $4,500 - - $459
-
MMBtu
$29,856
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,575 $3,500 $13,092
284,609
kWh
$3,483
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $3,461 $3,240 - - $3,461
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $2,943 $1,500 $2,566
55,789
kWh
- $377
-
MMBtu
-
05 2.4113: Install motor voltage controller on lightly loaded motors $1,333 $2,275 $1,005
21,840
kWh
$328
-
kW-mo/yr
- -
TOTAL RECOMMENDED $54,627 $15,015 $16,663
362,238
kWh
$3,811
-
kW-mo/yr
$4,297
-
MMBtu
$29,856
TOTAL IMPLEMENTED $53,294 $12,740 $15,658
340,398
kWh
$3,483
-
kW-mo/yr
$4,297
-
MMBtu
$29,856
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs