Assessment Year | 2016 |
---|---|
Principal Product | Catalysts and Additives |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 86 |
Plant Area |
300,000
ft2
|
Annual Production | 2,319
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $402,577 | 8,817,737 |
kWh
|
$0.046 |
Electricity Demand | $235,841 | 22,410 |
kW-mo/yr
|
$10.52 |
Natural Gas | $149,213 | 51,239 |
MMBtu
|
$2.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,294 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $30,315 | $4,500 | - | - |
$459
-
MMBtu
|
$29,856 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,575 | $3,500 |
$13,092
284,609
kWh
|
$3,483
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $3,461 | $3,240 | - | - |
$3,461
-
MMBtu
|
- | |
04 | 2.7261: Install timers and/or thermostats | $2,943 | $1,500 |
$2,566
55,789
kWh
|
- |
$377
-
MMBtu
|
- | |
05 | 2.4113: Install motor voltage controller on lightly loaded motors | $1,333 | $2,275 |
$1,005
21,840
kWh
|
$328
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $54,627 | $15,015 |
$16,663
362,238
kWh
|
$3,811
-
kW-mo/yr
|
$4,297
-
MMBtu
|
$29,856 | ||
TOTAL IMPLEMENTED | $53,294 | $12,740 |
$15,658
340,398
kWh
|
$3,483
-
kW-mo/yr
|
$4,297
-
MMBtu
|
$29,856 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs