ITAC Assessment: MO0225
ITAC logo
ITAC Assessment: MO0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Corrugated Packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 70,000
ft2
Annual Production 300,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,844 1,861,958
kWh
Electricity Demand $10,686 424
kW-mo/yr
Electricity Fees $12,131 -
Natural Gas $104,810 24,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $285,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4325: Upgrade conveyors $110,784 $50,000 - - - $110,784
02 4.451: Add additional production shift $87,000 $50,000 - - - $87,000
03 4.432: Cross-train personnel to avoid lost time $4,841 $12,500 - - - $4,841
04 4.711: Initiate a total quality management program $10,440 $25,000 - - - $10,440
05 4.514: Re-arrange equipment layout to reduce handling costs $4,900 $10,000 - - - $4,900
06 4.611: Begin a practice of predictive / preventative maintenance $2,136 $5,500 - - - $2,136
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,074 $2,072 $963
17,292
kWh
$111
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $343 $519 $303
5,569
kWh
$40
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $4,340 $160 $3,795
67,995
kWh
$545
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $1,052 $191 $923
16,413
kWh
$129
-
kW-mo/yr
- -
11 2.4133: Use most efficient type of electric motors $6,389 $7,570 $5,942
106,389
kWh
$447
-
kW-mo/yr
- -
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,085 - $1,943
34,877
kWh
$142
-
kW-mo/yr
- -
13 3.6193: Install equipment (eg compactor) to reduce disposal costs $48,948 $50,000 - - $48,948
-
lb
-
14 3.7196: Use re-usable filters $774 $799 - - $774
-
lb
-
TOTAL RECOMMENDED $285,106 $214,311 $13,869
248,535
kWh
$1,414
-
kW-mo/yr
$49,722
-
lb
$220,101
TOTAL IMPLEMENTED $16,503 $25,761 $8,808
157,679
kWh
$718
-
kW-mo/yr
- $6,977
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs